GLGridlinks SolutionsRequest a Quote

Service · Cable Termination

HV/EHV Cable Termination & Jointing — MV to 500 kV

Indoor and outdoor terminations and joints for AIS and GIS, MV through EHV.

The engineering problem

Terminations and joints are a leading cause of cable failure. Poor preparation or contamination leads to PD and breakdown, often long after energisation.

Capability

  • GIS plug-in and dry-type terminations
  • Outdoor porcelain and composite terminations
  • Straight, transition and sectionalising joints
  • Cross-bonding and sheath systems
  • Post-installation testing

Voltage / application

11 kV22 kV33 kV66 kV132 kV220 kV275 kV330 kV500 kV

Inputs — client data required

  • Cable and accessory data
  • OEM accessory instructions
  • Route and bonding design
  • Access and outage plans

Deliverables

  • Jointing and termination records
  • Photographic records of each stage
  • Sheath and insulation test results
  • As-built records

Methodology

  1. Stage 1

    Preparation

    Check accessories, tools and environment.

  2. Stage 2

    Installation

    Prepare and install per OEM instructions.

  3. Stage 3

    Inspection

    Hold-point checks and records.

  4. Stage 4

    Testing

    Sheath and withstand testing.

Design gates

Materials check

Accessories verified

Installation hold point

Inspection passed

Testing

Results accepted

Verification — checker / approver model

  1. 1.Certified jointer performs work
  2. 2.Supervisor inspects hold points
  3. 3.Client witnesses where required

Standards

IEC 60840IEC 62067IEC 62271-209AS/NZS 1429

Utility requirements

  • DNSP connection and design standards (e.g. Ausgrid, Endeavour, Essential, Energex/Ergon, Powercor, SA Power Networks)
  • TNSP requirements (e.g. Transgrid, Powerlink, AusNet, ElectraNet, TasNetworks)
  • AEMO / National Electricity Rules Chapter 5 connection obligations
  • Network operator access, switching and permit-to-work rules

Quality controls

  • ITP with photographic hold points
  • Environmental controls for cleanliness and humidity
  • Jointer competency records

HSE considerations

  • Safety in Design (SiD) workshops and hazard register
  • HV access, isolation and permit-to-work compliance
  • Safe Work Method Statements for high-risk construction work
  • Exclusion zones, step/touch potential and induced voltage controls

Sustainability

  • Material efficiency and reduced site rework
  • Waste segregation and recycling on site
  • Embodied-carbon awareness in equipment selection

Asset lifecycle — ISO 55001 perspective

  • Design decisions recorded against asset life-cycle cost (ISO 55001)
  • Asset data and as-built records handed over in client asset-register format
  • Maintainability and spares strategy considered at design stage

Interfaces

  • GIS installation
  • Civil and cable laying
  • Testing teams
  • Accessory OEMs

Typical programme

PreparationDays
Installation per termination1–3 days
TestingDays

Indicative only — actual programme depends on scope, approvals and outage windows.

Case studies

Technical FAQs

Do you work with all accessory brands?

We work to the accessory OEM's instructions and training requirements.

Capability datasheet

The Cable Termination capability datasheet (PDF) is available on request.

Request datasheet

Discuss your project

Share voltage, scope and programme and an engineer will be in touch.

Discuss your project