Operating model
One lifecycle, not service silos
- 01
Plan
Define the need, constraints, connection pathway and delivery strategy.
Services
Products & rentals
- —
ISO controls
- ISO 21502 project initiation
- ISO 31000 risk register
- ISO 37301 compliance obligations
Evidence you receive
- Scope and requirements register
- Risk register
- Stakeholder and utility interface plan
- 02
Study
Prove the network and safety case before committing to design.
Services
Products & rentals
- —
ISO controls
- ISO 9001 design input review
- Independent checker on every calculation
Evidence you receive
- Load flow, fault level and protection studies
- Earthing study (IEEE 80 / AS 2067)
- Arc-flash assessment
Example: 132/33 kV Zone Substation
- 03
Design
Primary and secondary design through staged review gates.
Products & rentals
- —
ISO controls
- ISO 9001 design review at 30/60/90/IFC
- Checker / approver sign-off
- ISO/IEC 27001 classification of client drawings
Evidence you receive
- Design review comment close-out register
- Issued-for-construction drawing set
- Design verification records
Example: 132/33 kV Zone Substation
- 04
Procure
Specification-led selection with technical compliance, never catalogue buying.
Services
Products & rentals
ISO controls
- ISO 9001 supplier evaluation
- ISO 37001 anti-bribery due diligence
- Brand relationship status disclosed
Evidence you receive
- Technical compliance matrix
- Vendor document review records
- Supplier approval record
- 05
Manufacture
Expedite and inspect during OEM manufacture.
Services
ISO controls
- ISO 9001 inspection and test plan (ITP)
- Hold and witness points
Evidence you receive
- Approved ITP
- Manufacturing progress and expediting reports
- 06
FAT
Factory acceptance testing against the specification before shipment.
Services
Products & rentals
ISO controls
- ISO 9001 witnessed FAT
- Nonconformance (NCR) process
Evidence you receive
- Signed FAT reports
- Routine test certificates
- NCR log
- 07
Install
Erect, terminate and lay cable under controlled site procedures.
Products & rentals
ISO controls
- ISO 45001 SWMS and permits
- ISO 14001 SF6 / gas handling
- ITP hold points
Evidence you receive
- Completed ITP checklists
- Gas filling and dew-point records
- As-built records
Example: 330 kV GIS Retrofit
- 08
Test
Site acceptance and diagnostic testing with calibrated, traceable instruments.
Services
Products & rentals
ISO controls
- ISO 9001 calibration in-date 100%
- Acceptance criteria per standard
Evidence you receive
- PD, withstand, SFRA and tan-delta results
- Calibration certificates
- Test reports against acceptance criteria
- 09
Commission
Prove protection, control and SCADA end to end.
Services
Products & rentals
ISO controls
- Commissioning plan with hold points
- ISO/IEC 27001 SCADA configuration control
Evidence you receive
- Secondary injection records
- Point-to-point SCADA checks
- Commissioning certificates
- 10
Energise
Controlled energisation with the network operator.
Services
Products & rentals
- —
ISO controls
- ISO 45001 switching and access authorities
- Utility energisation approval
Evidence you receive
- Energisation programme
- Switching sheets
- Post-energisation checks
Example: Renewable Connection Testing
- 11
Operate
Monitor performance, power quality and asset condition.
Services
Client-led phaseProducts & rentals
ISO controls
- ISO 55001 asset information
- ISO 50001 energy performance
- ISO 22301 continuity
Evidence you receive
- Power quality reports
- Condition monitoring data
- 12
Maintain
Planned and condition-based maintenance and diagnostics.
Products & rentals
ISO controls
- ISO 55001 maintenance strategy
- ISO 45001 safe work
Evidence you receive
- Maintenance and diagnostic test reports
- Defect and NCR trends
- 13
Renew / Replace
Life-extension, retrofit or replacement decisions based on condition and risk.
Products & rentals
ISO controls
- ISO 55001 lifecycle decision-making
- ISO 14001 decommissioning and gas recovery
Evidence you receive
- Condition and risk assessment
- Replacement business case inputs
Example: 330 kV GIS Retrofit
Controls are aligned to the referenced ISO standards; this is not a claim of certification. See the Quality page for confirmed certifications.