Service · HV/EHV Testing & Commissioning
HV/EHV Testing & Commissioning — Transformers, Switchgear, Cables, Protection
The engineering problem
Assets must be proven safe and fit for service before energisation. Incomplete testing or poor records delay energisation and can hide defects that fail in service.
Capability
- Power-frequency, resonant and VLF withstand testing
- Partial discharge measurement and diagnostics
- Transformer SFRA, tan delta, ratio and winding resistance
- Protection secondary injection and scheme testing
- Cable sheath and insulation testing
- Diagnostic condition assessment
Voltage / application
Inputs — client data required
- Equipment data and factory test reports
- Commissioning plan and test sheets
- Protection settings
- Site access and outage windows
Deliverables
- Signed test sheets and results
- Test reports with pass/fail against criteria
- Calibration certificates for instruments used
- Commissioning dossier
Engineering software
- OEM test-set software for automated test plans
Methodology
Stage 1
Planning
Agree test plan and acceptance criteria.
Stage 2
Pre-commissioning
Mechanical and insulation checks.
Stage 3
Testing
Primary and secondary tests.
Stage 4
Review
Results checked against criteria.
Stage 5
Handover
Dossier issued.
Design gates
Test plan approved
Criteria agreed
Pre-commissioning complete
Ready for testing
Tests complete
Results accepted
Energisation
Client approval
Verification — checker / approver model
- 1.Test engineer performs tests
- 2.Senior engineer reviews results
- 3.Client witnesses hold points
Standards
Utility requirements
- DNSP connection and design standards (e.g. Ausgrid, Endeavour, Essential, Energex/Ergon, Powercor, SA Power Networks)
- TNSP requirements (e.g. Transgrid, Powerlink, AusNet, ElectraNet, TasNetworks)
- AEMO / National Electricity Rules Chapter 5 connection obligations
- Network operator access, switching and permit-to-work rules
Quality controls
- Inspection and Test Plan
- Calibrated instruments with traceable certificates
- Hold and witness points
- Non-conformance reporting
HSE considerations
- Safety in Design (SiD) workshops and hazard register
- HV access, isolation and permit-to-work compliance
- Safe Work Method Statements for high-risk construction work
- Exclusion zones, step/touch potential and induced voltage controls
- Test-area barriers and discharge procedures
Cyber controls
- Relay configuration files under version control
- Laptop and test-set hygiene before connection to protection networks
Sustainability
- Rental test equipment shared across projects
- Early defect detection extends asset life
Asset lifecycle — ISO 55001 perspective
- Design decisions recorded against asset life-cycle cost (ISO 55001)
- Asset data and as-built records handed over in client asset-register format
- Maintainability and spares strategy considered at design stage
- Baseline test data recorded for future trend comparison
Interfaces
- OEMs
- Protection designers
- Network operators
- Installation contractors
Typical programme
| Planning | 1–2 weeks |
| Testing | Days to weeks per asset |
| Reporting | 1 week |
Indicative only — actual programme depends on scope, approvals and outage windows.
Case studies
Technical FAQs
Are your instruments calibrated?
Yes. Calibration status for rental instruments is shown on our Rentals page.
Can you test at short notice?
Subject to resources and outage windows — contact us with your dates.
Capability datasheet
The HV/EHV Testing & Commissioning capability datasheet (PDF) is available on request.
Request datasheetDiscuss your project
Share voltage, scope and programme and an engineer will be in touch.