GridLinksRequest a Quote

Engineering procurement

FACTS & Reactive Compensation — Voltage support, power factor and harmonic control

Weak-grid connections and large loads needing dynamic reactive support to meet NER access standards.

Selection path

Specification parameters

Selection runs Voltage → Current → Fault rating → Application → Standard → Indoor/outdoor → Insulation → OEM → Delivery → Utility acceptance → Origin → Certification → Datasheet.

01Voltage
11 – 330 kV connection (via coupling transformer)
02Current
Per Mvar rating
03Fault rating
Per connection point fault level and SCR
04Application
STATCOM, SVC, capacitor banks, shunt reactors, harmonic filters
05Standard
IEC 60871, IEC 61954, IEC 62927, AS/NZS 61000, NER S5.2.5
06Indoor / outdoor
Containerised / indoor valve hall; outdoor banks
07Insulation medium
Air; oil-immersed reactors
08OEM
Confirmed per RFQ against current OEM / distributor authorisation
09Delivery status
Lead time confirmed at offer; tracked to OTIF after award
10Utility acceptance
Checked against the target DNSP/TNSP approved-equipment list for each project
11Country of origin
Declared per offer (OEM factory location stated in technical compliance matrix)
12Certification
Type tests and R1/R2 model validation (PSS/E, PSCAD)
13Datasheet
Issued with the technical offer — request via RFQ

How we procure

  1. STEP 1

    Specification review

    Client spec, utility standard and SLD reviewed; deviations flagged.

  2. STEP 2

    Vendor shortlist

    OEMs screened for type tests, utility acceptance and lead time.

  3. STEP 3

    Technical compliance matrix

    Clause-by-clause compliance and declared country of origin.

  4. STEP 4

    FAT

    Factory acceptance testing with witness and hold points.

  5. STEP 5

    Delivery & expediting

    Tracked to OTIF; inspection on receipt.

  6. STEP 6

    SAT & handover

    Site acceptance testing, records and datasheets handed over.

Values are indicative specification ranges, not offers. Gridlinks does not sell online: every supply is engineered against your specification, confirmed in a technical compliance matrix, and subject to current OEM / distributor authorisation.

Have a specification or scope ready?

Send us voltage class, equipment type and project phase — we respond within one business day.

Start an RFQ