MV / EHV Panels — Zone substation and primary distribution switchboards

Arc-fault-safe, utility-compliant MV switching for zone substations, mines and large industrial loads.

Selection path

Specification parameters

Selection runs Voltage → Current → Fault rating → Application → Standard → Indoor/outdoor → Insulation → OEM → Delivery → Utility acceptance → Origin → Certification → Datasheet.

01Voltage
7.2 / 12 / 24 / 36 kV rated
02Current
630 – 4000 A
03Fault rating
16 / 20 / 25 / 31.5 / 40 kA, 3 s
04Application
Metal-clad switchboards, RMUs, kiosks
05Standard
IEC / AS 62271-200, -100, -103; IAC AFLR per Annex A
06Indoor / outdoor
Indoor metal-clad; outdoor RMU and kiosk
07Insulation medium
Air, SF6, or solid-insulated with vacuum interrupters
08OEM
Confirmed per RFQ against current OEM / distributor authorisation
09Delivery status
Lead time confirmed at offer; tracked to OTIF after award
10Utility acceptance
Checked against the target DNSP/TNSP approved-equipment list for each project
11Country of origin
Declared per offer (OEM factory location stated in technical compliance matrix)
12Certification
Internal arc classification (IAC) and type-test certificates
13Datasheet
Issued with the technical offer — request via RFQ

How we procure

  1. STEP 1

    Specification review

    Client spec, utility standard and SLD reviewed; deviations flagged.

  2. STEP 2

    Vendor shortlist

    OEMs screened for type tests, utility acceptance and lead time.

  3. STEP 3

    Technical compliance matrix

    Clause-by-clause compliance and declared country of origin.

  4. STEP 4

    FAT

    Factory acceptance testing with witness and hold points.

  5. STEP 5

    Delivery & expediting

    Tracked to OTIF; inspection on receipt.

  6. STEP 6

    SAT & handover

    Site acceptance testing, records and datasheets handed over.

Values are indicative specification ranges, not offers. Gridlinks does not sell online: every supply is engineered against your specification, confirmed in a technical compliance matrix, and subject to current OEM / distributor authorisation.