Engineering procurement

LV & ELV Panels — Main switchboards, DBs and MCCs, 240 / 415 V

Verified LV assemblies where design verification to AS/NZS 61439 must be proven, not assumed.

Selection path

Specification parameters

Selection runs Voltage → Current → Fault rating → Application → Standard → Indoor/outdoor → Insulation → OEM → Delivery → Utility acceptance → Origin → Certification → Datasheet.

01Voltage
240 V single-phase / 415 V three-phase
02Current
63 – 6300 A
03Fault rating
Icw 10 – 100 kA, 1 s
04Application
MSBs, DBs, MCCs, PFC boards
05Standard
AS/NZS 61439.1 / .2 / .3; AS/NZS 3000
06Indoor / outdoor
IP2X indoor to IP56 outdoor
07Insulation medium
Air
08OEM
Confirmed per RFQ against current OEM / distributor authorisation
09Delivery status
Lead time confirmed at offer; tracked to OTIF after award
10Utility acceptance
Checked against the target DNSP/TNSP approved-equipment list for each project
11Country of origin
Declared per offer (OEM factory location stated in technical compliance matrix)
12Certification
Design verification records (Clause 10) and routine verification (Clause 11)
13Datasheet
Issued with the technical offer — request via RFQ

How we procure

  1. STEP 1

    Specification review

    Client spec, utility standard and SLD reviewed; deviations flagged.

  2. STEP 2

    Vendor shortlist

    OEMs screened for type tests, utility acceptance and lead time.

  3. STEP 3

    Technical compliance matrix

    Clause-by-clause compliance and declared country of origin.

  4. STEP 4

    FAT

    Factory acceptance testing with witness and hold points.

  5. STEP 5

    Delivery & expediting

    Tracked to OTIF; inspection on receipt.

  6. STEP 6

    SAT & handover

    Site acceptance testing, records and datasheets handed over.

Values are indicative specification ranges, not offers. Gridlinks does not sell online: every supply is engineered against your specification, confirmed in a technical compliance matrix, and subject to current OEM / distributor authorisation.

Have a specification or scope ready?

Send us voltage class, equipment type and project phase — we respond within one business day.

Start an RFQ