GridLinksRequest a Quote

Engineering procurement

Smart Meters & MCBs — Revenue metering and final-circuit protection

Accurate, AMI-ready metering and coordinated LV protection compliant with NMI and AS/NZS requirements.

Selection path

Specification parameters

Selection runs Voltage → Current → Fault rating → Application → Standard → Indoor/outdoor → Insulation → OEM → Delivery → Utility acceptance → Origin → Certification → Datasheet.

01Voltage
240 / 415 V
02Current
6 – 125 A (MCB/RCBO); CT-connected meters
03Fault rating
6 / 10 / 15 kA breaking capacity
04Application
Utility, C&I and embedded network metering; final circuits
05Standard
AS/NZS 60898, AS/NZS 61008/61009, NMI M 6, IEC 62053
06Indoor / outdoor
Meter panels and enclosures
07Insulation medium
Air
08OEM
Confirmed per RFQ against current OEM / distributor authorisation
09Delivery status
Lead time confirmed at offer; tracked to OTIF after award
10Utility acceptance
Checked against the target DNSP/TNSP approved-equipment list for each project
11Country of origin
Declared per offer (OEM factory location stated in technical compliance matrix)
12Certification
NMI pattern approval (meters); RCM marking
13Datasheet
Issued with the technical offer — request via RFQ

How we procure

  1. STEP 1

    Specification review

    Client spec, utility standard and SLD reviewed; deviations flagged.

  2. STEP 2

    Vendor shortlist

    OEMs screened for type tests, utility acceptance and lead time.

  3. STEP 3

    Technical compliance matrix

    Clause-by-clause compliance and declared country of origin.

  4. STEP 4

    FAT

    Factory acceptance testing with witness and hold points.

  5. STEP 5

    Delivery & expediting

    Tracked to OTIF; inspection on receipt.

  6. STEP 6

    SAT & handover

    Site acceptance testing, records and datasheets handed over.

Values are indicative specification ranges, not offers. Gridlinks does not sell online: every supply is engineered against your specification, confirmed in a technical compliance matrix, and subject to current OEM / distributor authorisation.

Have a specification or scope ready?

Send us voltage class, equipment type and project phase — we respond within one business day.

Start an RFQ