Service · Design Management
Design Management & Owner's Engineer — Multi-Discipline Substation Packages
Owner's engineer and design management across multi-discipline substation packages.
The engineering problem
Large substation packages involve many designers, vendors and reviewers. Without firm interface control, RFIs pile up and non-compliances reach site.
Capability
- Design review against client standards
- Interface control across disciplines and vendors
- Technical query and RFI management
- Vendor document review
- Compliance tracking
Voltage / application
11 kV22 kV33 kV66 kV132 kV220 kV275 kV330 kV500 kV
Inputs — client data required
- Contract and technical specifications
- Design programme
- Vendor document schedules
- Client standards
Deliverables
- Design review comment sheets
- Interface register
- RFI and TQ register
- Compliance matrix
- Design status reports
Engineering software
- Common data environment (CDE) used on the project
Methodology
Stage 1
Mobilise
Set up registers and review process.
Stage 2
Review
Review submissions at each gate.
Stage 3
Control
Track interfaces, RFIs and compliance.
Stage 4
Close-out
Confirm all comments closed.
Design gates
30%
Concept review
60%
Design development review
90%
Pre-IFC review
IFC
Compliance confirmed
Verification — checker / approver model
- 1.Originator prepares the deliverable
- 2.Independent checker verifies calculations, drawings and assumptions
- 3.Discipline lead approves for issue
- 4.RPEQ / chartered engineer sign-off where required by jurisdiction or client
Standards
AS 2067IEC 61936-1ISO 21502Client specifications
Utility requirements
- DNSP connection and design standards (e.g. Ausgrid, Endeavour, Essential, Energex/Ergon, Powercor, SA Power Networks)
- TNSP requirements (e.g. Transgrid, Powerlink, AusNet, ElectraNet, TasNetworks)
- AEMO / National Electricity Rules Chapter 5 connection obligations
- Network operator access, switching and permit-to-work rules
Quality controls
- Review checklists
- Comment close-out tracking
- Document control
HSE considerations
- SiD process oversight
- Hazard register maintained across designers
Cyber controls
- CDE access controls
- Review of OT security design where in scope
Sustainability
- Material efficiency and reduced site rework
- Waste segregation and recycling on site
- Embodied-carbon awareness in equipment selection
Asset lifecycle — ISO 55001 perspective
- Design decisions recorded against asset life-cycle cost (ISO 55001)
- Asset data and as-built records handed over in client asset-register format
- Maintainability and spares strategy considered at design stage
Interfaces
- All design disciplines
- Vendors and OEMs
- Client and network operator
Typical programme
| Mobilisation | 1–2 weeks |
| Ongoing review | For the design phase |
Indicative only — actual programme depends on scope, approvals and outage windows.
Case studies
Technical FAQs
Can you act as owner's engineer?
Yes, on behalf of asset owners and developers.
Capability datasheet
The Design Management capability datasheet (PDF) is available on request.
Request datasheetDiscuss your project
Share voltage, scope and programme and an engineer will be in touch.