GridLinksRequest a Quote

Engineering procurement

Control & Protection Panels — Substation protection, control & automation (PAC)

Integrated PAC panels that pass FAT first time and interface cleanly with utility SCADA.

Selection path

Specification parameters

Selection runs Voltage → Current → Fault rating → Application → Standard → Indoor/outdoor → Insulation → OEM → Delivery → Utility acceptance → Origin → Certification → Datasheet.

01Voltage
Serving 11 – 500 kV bays; 110/125 V DC auxiliary
02Current
1 A / 5 A CT secondaries
03Fault rating
Per CT/VT burden and accuracy class
04Application
Line, transformer, bus and feeder protection; RTU/SCADA
05Standard
IEC 61850, IEC 60255, AS/NZS 61439 (enclosure), utility PAC standards
06Indoor / outdoor
Indoor control buildings / relay rooms
07Insulation medium
Air
08OEM
Confirmed per RFQ against current OEM / distributor authorisation
09Delivery status
Lead time confirmed at offer; tracked to OTIF after award
10Utility acceptance
Checked against the target DNSP/TNSP approved-equipment list for each project
11Country of origin
Declared per offer (OEM factory location stated in technical compliance matrix)
12Certification
FAT records, IEC 61850 conformance (relay level), cyber hardening per IEC 62443
13Datasheet
Issued with the technical offer — request via RFQ

How we procure

  1. STEP 1

    Specification review

    Client spec, utility standard and SLD reviewed; deviations flagged.

  2. STEP 2

    Vendor shortlist

    OEMs screened for type tests, utility acceptance and lead time.

  3. STEP 3

    Technical compliance matrix

    Clause-by-clause compliance and declared country of origin.

  4. STEP 4

    FAT

    Factory acceptance testing with witness and hold points.

  5. STEP 5

    Delivery & expediting

    Tracked to OTIF; inspection on receipt.

  6. STEP 6

    SAT & handover

    Site acceptance testing, records and datasheets handed over.

Values are indicative specification ranges, not offers. Gridlinks does not sell online: every supply is engineered against your specification, confirmed in a technical compliance matrix, and subject to current OEM / distributor authorisation.

Have a specification or scope ready?

Send us voltage class, equipment type and project phase — we respond within one business day.

Start an RFQ