Engineering procurement
Cable Sockets & End Terminations — MV–EHV cable terminations, joints and lugs
Selection path
Specification parameters
Selection runs Voltage → Current → Fault rating → Application → Standard → Indoor/outdoor → Insulation → OEM → Delivery → Utility acceptance → Origin → Certification → Datasheet.
- 01Voltage
- 12 – 362 kV Um
- 02Current
- Matched to conductor size (up to 2500 mm² Cu/Al)
- 03Fault rating
- Matched to cable screen fault rating
- 04Application
- GIS plug-in, transformer, outdoor sealing ends, joints
- 05Standard
- IEC 60840, IEC 62067, IEC 62271-209, AS/NZS 1429
- 06Indoor / outdoor
- Indoor GIS / dry-type; outdoor porcelain or composite
- 07Insulation medium
- Pre-moulded silicone/EPDM, fluid or dry-filled
- 08OEM
- Confirmed per RFQ against current OEM / distributor authorisation
- 09Delivery status
- Lead time confirmed at offer; tracked to OTIF after award
- 10Utility acceptance
- Checked against the target DNSP/TNSP approved-equipment list for each project
- 11Country of origin
- Declared per offer (OEM factory location stated in technical compliance matrix)
- 12Certification
- Prequalification and type-test reports to cable system standard
- 13Datasheet
- Issued with the technical offer — request via RFQ
How we procure
STEP 1
Specification review
Client spec, utility standard and SLD reviewed; deviations flagged.
STEP 2
Vendor shortlist
OEMs screened for type tests, utility acceptance and lead time.
STEP 3
Technical compliance matrix
Clause-by-clause compliance and declared country of origin.
STEP 4
FAT
Factory acceptance testing with witness and hold points.
STEP 5
Delivery & expediting
Tracked to OTIF; inspection on receipt.
STEP 6
SAT & handover
Site acceptance testing, records and datasheets handed over.
Values are indicative specification ranges, not offers. Gridlinks does not sell online: every supply is engineered against your specification, confirmed in a technical compliance matrix, and subject to current OEM / distributor authorisation.
Have a specification or scope ready?
Send us voltage class, equipment type and project phase — we respond within one business day.