Equipment
HV cable termination
Interface between an HV cable and switchgear, transformer or overhead line — GIS plug-in, dry-type or outdoor.
Connected entities
- Governed byIEC 62271-209
- Verified byPartial discharge (PD) measurement
- Delivered byCable termination
Have a specification or scope ready?
Send us voltage class, equipment type and project phase — we respond within one business day.
