GridLinks Solutions Pty LtdRequest a Quote

Sector

BESS

Battery energy storage from specification through grid connection and commissioning.

01Sector challenge

  • Grid-forming capability and system-strength requirements
  • Fire separation and thermal design
  • Augmentation and degradation over the asset life

02Technical services

  • Technical Studies

    Load flow, fault level, protection coordination, arc flash and insulation coordination studies.

  • Substation Design

    Primary and secondary design for AIS and GIS substations from 11 kV to 500 kV.

  • HV/EHV Testing & Commissioning

    Routine, site acceptance and diagnostic testing for transformers, switchgear, cables and protection.

03Applicable standards

  • IEC 62933
  • AS/NZS 5139
  • UL 9540A
  • NER Chapter 5

04Products

05Case studies

06Compliance

  • Connection agreement and GPS compliance testing
  • Fire authority engagement

See how controls apply at every phase in our lifecycle operating model.

07Next step

Send us your scope, single-line diagram or specification and we'll respond within one business day.

Discuss your bess project

Have a specification or scope ready?

Send us voltage class, equipment type and project phase — we respond within one business day.

Start an RFQ